APPLICATIONS & CASE STUDIES

Read our case studies to see how Imbrium helped clients solve the most challenging stormwater treatment problems in the most demanding environments.

37th Street Storm Trunk Relocation

37th Street Storm Trunk Relocation

The City of Calgary needed to update their underground infrastructure to meet the growing demands of the city. As the city grows, the underground...

Read the rest of this article...

Stormceptor EFO  Saves Time and Money at a New Sobeys

Stormceptor EFO Saves Time and Money at a New Sobeys

The Brookside Mall Sobeys is a modern full-service grocery store located on Fredericton’s South Side. A variety of retailers, services, and life...

Read the rest of this article...

MANAGING THE POLLUTANTS AT BRAMPTON MAINTENANCE YARD

MANAGING THE POLLUTANTS AT BRAMPTON MAINTENANCE YARD

The City of Brampton, Ontario, Canada is redeveloping its Public Works Yards to meet the future of Brampton’s growth, service expectations and c...

Read the rest of this article...

EXPOL Manufacturing Plant Trial

EXPOL Manufacturing Plant Trial

EXPOL is the largest manufacturer and distributor of polystyrene products in New Zealand. EXPOL are committed to protecting the natural environment...

Read the rest of this article...

Cooksville Stormwater Pond

Cooksville Stormwater Pond

In August of 2009 a massive storm hit Mississauga, Ontario which flooded approximately 400 homes. The damage from this storm was caused by the river...

Read the rest of this article...

Hélène-Boullé street stormwater runoff treated by Stormceptor® EF

Hélène-Boullé street stormwater runoff treated by Stormceptor® EF

Ville de Broucherville took advantage of the repairs to the Hélène-Boullé and Darontal Streets in order to improve the management of the sector’s stormwater. The stormwater in the neighborhood was conveyed directly to Sabrevios Creek, which is a sensitive environment where many fish live. The city wanted to reduce the total suspended solids (TSS) released in this watercourse. The city had an area of 5.07 Ha with a 49% imperviousness and a treatment flow rate of 263L/s. The city wanted to remove 40% TSS in order to reduce the amount of TSS entering the creek.

Read the rest of this article...

Page 1 of 9First   Previous   [1]  2  3  4  5  6  7  8  9  Next   Last   
Imbrium Lunch and Learn
Contact Imbrium